Release Plan

Title: Release Plan Version: 1.0 Owner: [TENANT_CONFIGURATION_REQUIRED — Product Owner / Delivery Lead] Status: Draft Last reviewed: 2026-09-07 Next review: [TENANT_CONFIGURATION_REQUIRED] Reviewers: Product, Architecture, Security

Purpose and scope

Illustrative phased release plan sequencing the epics in backlog-epics-and-user-stories.md. Actual dates are [TENANT_CONFIGURATION_REQUIRED].

Phased approach

Phase Scope Rationale
Phase 0 — Foundations E12 (config), E13 (security/guardrails foundations), core data model, CI/CD gates Nothing else is safe to build without these in place
Phase 1 — CV Bank & TAN E1, E2 Establishes the data entering the pipeline
Phase 2 — Matching & Shortlist E3, E4 First AI-assisted capability, with human gate
Phase 3 — Interview Lifecycle E5 Core recruiter/HR workflow loop
Phase 4 — Offer & Acceptance E6 Requires E3–E5 stable
Phase 5 — Green Form & Verification E7, E8 Onboarding data collection
Phase 6 — Employee Conversion & Integrations E9, E10 Final workflow leg, requires downstream integration partners ready
Phase 7 — Hardening E11 depth, full security-test-plan.md, ai-evaluation-strategy.md maturity Pre-general-availability hardening

Go/no-go criteria per phase

Each phase gate requires: definition-of-done.md satisfied for all included stories, no open Critical/High security findings, and sign-off per compliance-review-checklist.md items relevant to that phase’s data handling.

Assumptions and dependencies

Actual timeline, team sizing, and parallelization strategy are [TENANT_CONFIGURATION_REQUIRED] and depend on organizational capacity, not fixed here.

Change control

Version Date Author Change
1.0 2026-09-07 Documentation package generation Initial creation